💾 Archived View for cosmic.voyage › Hoffnung › 017.txt captured on 2024-08-25 at 01:00:31.
⬅️ Previous capture (2023-05-24)
-=-=-=-=-=-=-
-+-+-+- Recovery Report -+-+-+- C98.117 -+-+-+- Red -+-+-+- Autonomous System Recovery in progress. Apparently there are four years missing in the records. Central Processing is disconnected from the internal networks and Autonomous System Recovery has suffered severe delays. We finally managed to get a backup reactor online and reestablish communication with the QEC. OK hull leaks OK solar sail repairs OK nuclear backup reactor online FAIL atmosphere regeneration FAIL temperature control FAIL water circulation FAIL arboretum cycle OK cryo berths stabilised Initial reports account for 324 cold sleepers revivable. The first medical team and two security teams are among the fatalities. The armoury has been breached and internal damage assessments indicate firefights and sabotage. Many sleepers show sign of malfunctioning during reanimation and secondary necrosis effects. The dead berths have been radiated and filled with bio conservatory epoxy resin for a slow cellular water replacement plan. Their bodies are conserved for analysis at the landing site but no more energy is used for cooling and life support. The loss of all atmosphere was not compensated. Therefore, low vacuum conditions are still the norm and the scheduled inspection has been cancelled until we manage to assemble enough interstellar dust to restart atmosphere building. No suitable source of nitrogen is currently available, however. -+-+-+ End of Transmission -+-+-+ Signed SYS-ASR -+-+-+