💾 Archived View for eragon.re › log › 2023-04-07.gmi captured on 2023-05-24 at 17:52:42. Gemini links have been rewritten to link to archived content
⬅️ Previous capture (2023-04-19)
-=-=-=-=-=-=-
Hello, Eragon here.
I finished removing the broken tiles and the old mortar that got mold in it.
It's still wet I may need to let it dry before doing anything more to the bathroom.
But now I can see what I need to do to fix it. Just replace the mortar with some concrete one and use a good waterproof sealant for the new tiles.
I'm going to wash the old tiles and reuse them, just removing the limestone (Is that the name, of it ? The thing that get's deposed by the water over time.) and then fix them on the new concrete.
After that I will wash the tiles that I left on the walls and on the floor. And then I will do the new silicone joints.
Still no messages from mission control.
See you.
Eragon out.