💾 Archived View for clemat.is › saccophore › library › ezines › textfiles › ezines › F4ITH › tacs.tx… captured on 2021-12-03 at 14:04:38.
-=-=-=-=-=-=-
SystemX Test Access Connection Customer Line Testing on Digital Exchanges. hybrid <hybrid@f41th.com> _\'/_gBH ============================================= To allow testing of subscriber's lines, each subcriber has a Test Access relay in their SLU. The Test Access relay can connect the subs line to a 4-wire testng circuit called a "Test Common Highway." This arrangment is shown bellow. SLU Line Controller __________________________________________________ _________ ___ | .______________._________________________|__| |_ | # | | | | || 2 wires | | .... | |___|---|------O // TA1 // TA2 | |__:__:___| subs | O O | | | | | | .________|_____| | | | | | |::::::::|::::: | | | | | Switch | | | | ____|____ | Plane >|--->> | / 2 wires / 2 wires |_________| | | | | | | TA2 | From the | | | | | Module | | | | | | Controller | | | O -50v | |_________|______________|_________________________| | | | Test | Test The Test Access Relay | Line | Exchange ===================== ::::::::::::::::::::::::: Test Common Highway The MC can send an instruction via the Line Controller to operate Test Access relay (TA) in the SLU. With TA operated, the subscriber's line can be tested via the Test Line Pair of the Test Common Highway an contact TA1. The subscriber's line circuit can be tested via the Test Exchange pair of the Test Common Highway an contact TA2. If "Test Line" is connected to "Test Exchange" is is possible to monitor calls. The "Test Line" and "Test Exchange" pairs together comprise 1 Test Common Highway. The P-SWITCH ============ Following the Test Common Highway back from the SLU, we find it is connected to a piece of equipment called the P-SWITCH. The P-Switch is located in the Auxiliary Module and has 12 Test Common highways (Numbered 0 to 11) connected to it. 11 are availiable for connection to SLU's and 1 for the connection to Per Line Auxiliarys (PLA's). For design reasons, there cannot be more than 24 SLU's connected to each Test Common Highway. Because there are a maximum number of 8 subs per SLU, the maximum number of subs that can be connected to 1 Test Common Highway is 24x8= 192 subs. This means that 11 Test Common Highways can handle upto 2112 subs. However, a Concentrator has a maximum of 2048 subs. So the Test Common Highway is only connected to 128 subs. The Test Access relay contacts are simply teed off its associated Test Common Highway as shown bellow. _______________________ | _ | | To Test Access >> _| | 4 wires 24 SLU's .. | relay contacts >> _}--|---/---. per Test : | SLU 0 _| | | Common ----: |_______________________| | Highway : ___________:___________ / 4 wires : | _ | | : | To Test Access >> _| | | Test Access Relay :. | relay contacts >> _}--|-------O to Test Common | SLU 23 _| | | Highway Connections |_______________________| | =================== ::::::::::::::::::::::::: | _______________________ | | _ | | | To Test Access >> _| | | 4 wires 24 SLU's .. | relay contacts >> _}--|-------+---/---. per Test : | SLU 24 _| | | | Common ----: |_______________________| | | Highway : ___________:___________ | | : | _ | | | : | To Test Access >> _| | | | :. | relay contacts >> _}--|-------+-------O | SLU 47 _| | | | |_______________________| | | ::::::::::::::::::::::::: | / 4 wires ___________:___________ | | | : _ | | | Less than | To Test Access >> _| | | | 4 wires 24 SLU's .. | relay contacts >> _}--|-------+-------+---/---. on last : | SLU 255 _| | | | | Test ------: |_______________________| | | | Common : | | | Highway :. O O O TCH/0 TCH/1 TCH/11 ::::::To the P-SWITCH:::::: P-Q Links ========= There are 12 Test Common Highway's conencted to the P-SWITCH. Connected between the P-Switch and the Local Exchange are up to 4, 2 wire input/output circuits, known as P-Q Links. These are controlled by the Local Exchange PUS and can be used to test either the Line or the Exchange side of an SLU. The way in which this is done is shown bellow. The P-SWITCH/P-Q Link to Test Common Highway Connection ======================================================= LineSide| 2 wires | | reed relay | TCH/0 --------+---/-----------+---------------+---------------+-------> >>>>> --------+---/-----------+---------------+---------------+-------> ExchSide| 2 wires | | | LineSide| | | | TCH/1 --------+---------------+---------------+---------------+-------> >>>>> --------+---------------+---------------+---------------+-------> ExchSide| | | | LineSide| | | | TCH/2 --------+---------------+---------------+---------------+-------> >>>>> --------+---------------+---------------+---------------+-------> ExchSide| |(N) | | LineSide|(M) | | | TCH/3 --------+---------------+---------------+---------------+-------> >>>>> --------+---------------+---------------+---------------+-------> ExchSide| | | | / 2 wires / 2 wires / 2 wires / 2 wires | | | | TCH/11 --------+---------------+---------------+---------------+--------> >>>>>> --------+---------------+---------------+---------------+--------> | | | | | | | | | | | | (0) (1) (2) (3) ::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::: P-Q Links to Test Network Equipment ::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::: The connections between the Test Common Highways and the P-Q Links are made by reed relays. These relays are controlled by the Auxilliary Controller. (The Auxilliary Controller is part of the Auxilliary Module). Instructions to opertate these read relays are origionated by the Test Network Subsystem in the Local Exchange. They are then passed via MTS to the Module Controller, which passes them on to the Auxilliary Controller. If the reed relay marked (M) is operated, then P-Q Link 0 will be connected to the line side pair of the Test Common Highway 3. This will enable any of the subs connected to the Test Common Highway 3 to be tested, simply by operating their associated Test Access relay. Similarly, if reed relay (N) is operated, it will connect P-Q Link 1 to the Test Common Highway 2, exchange side. Monitoring ========== If "Test Line" and "Test Exchange" are connected toghether, it is possible to monitor the subs line. This is achieved by operating two reed relays on one P-Q Link as shown bellow. SLU Line Controller _______________________________ _________ | _________.______/._______|_____| | ___ | | | 2 wires | | |--------------->> | # | | : TA1 : TA2 | | ..... | To Switch Plane |___|---|---O// //O | |__:___:__| ::::::::::::::: | | | ______|________| | | | | | | | | | | |(TA2) | | | | | ___|___ | | | / 2 wires / |_______| | | | | | | | | | | | O -50v | |:::::::::::::::::: |___|____________|______________| ::From the Module:: | | ::Controller::::::: | | ::::::::::::::::::: | | : : _________________ : : 2 wires | | : |______/.____________|___._____________|________ : | : | | | : P-SWITCH | | 2 wires | / 2 wires | |___________________/.____________|___:_____________|________ TA relay shown operated | : | |___:_____________| : Monitoring The Subscriber Line : ============================== : ::: P-Q Link to Test ::: Network Equipment RSC Connections SystemX/X Local RCU Exchange Remote Test Network ================================================================ The total resistance of the test pair between the Test Equipment and the subscribers termination shall not exceed 2000ohms. Therefore RCU DSSS's can also be served from the TNS in the Main Exchange via P-SWITCH in the RCU and Q-SWITCH in the Main, providing the test pair does not exceed 2000ohmz. The prefered location of the Test Unit is to be as close as possible to the Test Network equipment. Exchanges built to SEP2 and SEP3 connection to RSC using Modern LTS. ==================================================================== Sub <--------x ----- x --------> Exchange <------. | ----- | .-------> | |_______| | |_____|_____| DSSS (Located at RCU) | | | | ____|_|_____ | | | P-SWITCH | |____________| | | | | ===============|=|====================================================== | | ____|_|_____ | | | Q-SWITCH | MINI TNS (Located at RCU) | | | | | | | | -----|----O-O-----|-------------O------------------O----- | __|_|___ | ____|____ _______|_______ | |Pseudo | | | | | | | |D/E Swt | | |R-SWITCH | | Test Network | |_| |_| |_________| | Controller | |_____::_| | | | |_______________| | || Built-in Line Test ___|________ | | || Equipment | V24 ACCESS | | | || |____________| | | || | | | || | | ===============|==||================================|==========|========= | || | | | || | | | Test (V24) (TNS) Dial-Back <<..| Pair | | via the main || | (MCS) Exchange Switch || | | Local VDT || | (I/O)------>> __||___________ | | | | | | | Test Unit LTS |____________________| | |_______________| | | ________________| | | | | | (MMI ACCESS) | | RCU | | MAIN EXCHANGE | __|__ | | M | | |_____| | | | (V24 or X25) | | | | =======================|======================|============================ | | | | __________|__________ __|__ | | | M | | LTS PROCESSOR | |_____| OMC |_____________________| | | |________ | | RSC | ________|_________ | |MML DIRECT ACCESS | ________ | | : | || ||_________| |_O/_____|_________| ||______|| (Users Terminal) | | --oooooo-- | | __|__ __|__ ________ (SystemX Terminal) | M || M | || ||_________ |_____||_____| _\'/_ ||______|| | | | --oooooo-- | (V24) (V24) _|_ | __|__ | M |________________| | M | Other Admin |___| |_____| Users Subscriber Line Test Codes